Here you can find latest and updated 70-480 exam questions answers. Our 70-480 practice questions are verified. These Microsoft 70-480 dumps consist of 70-480 exam questions practice tests. Purchasing 70-480 exam dumps is the easiest way to pass any exam in shortest possible time. And You can prepare in 2 formats. One is PDF file format and second is online 70-480 practice test engine software that can be easily accessed and downloaded. Practicing these online tests can prepare your Microsoft 70-480 exam questions answers. Our Microsoft 70-480 dumps is a promise to your success in your exam.

Tuesday, 19 January 2016

642-732 Sample Question: 10

Question: 10

After having the kick-off meeting for a new site survey project with your customer, which three factors need to be considered prior to beginning a WLAN site survey? (Choose three.)

A. Will an additional trip to the facility to perform the initial walkthrough be required?
B. How much time should be allocated to survey the locations for the controllers?
C. Will any additional regulatory or safety training be required to complete the site survey?
D. Is access available to all areas of the customer facility where the WLAN is planned to be deployed?
E. Which types of controllers and switches will be required to fully conduct the site survey in all areas of the customer facility?
F. Is access available to customer employees so that initial interviews can be performed?

Answer: A, C, D

Wednesday, 13 January 2016

642-732 Sample Question: 9

Question: 9

During the site survey kick-off meeting with your customer, they ask why you need to verify the existing network infrastructure. Which two reasons do you give them? (Choose two.)

A. You need to verify the make, model, and software versions of all the equipment that will connect to the WLAN components in order to ensure compatibility.
B. You need to verify that the equipment the WLAN components will connect to has sufficient memory capacity to support the additional WLAN connections.
C. You need to verify that there are sufficient switch ports to support the new WLAN connections.
D. You need to verify that the switches the WLAN components will connect to can supply 802.3af inline power, and that they have sufficient ports to support all the new WLAN devices.
E. Depending on the type of APs that are planned for, the deployment may require different types of PoE to be supplied by the LAB switches.

Answer: C, D